Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #3

Edit by Dozuki System

Edit approved by Dozuki System

Before
After
Unchanged

Step Lines

+[* black] Make sure all wires are correctly installed before inserting the new receptacle into the box.
+[* black] Gently push the outlet into the box. Tighten the mounting screws, and check that the receptacle is straight.
+[* black] Replace the cover plate, restore power, and test with a receptacle analyzer.

Image 1

No previous image

Added